Feature Application Form


INSURANCE DETAILS

All features must supply and attach current insurance details or complete a waiver form that will be forwarded

Browse
If appropriate documents do not comply, administration fees will be applicable as per clause 9.2 in our terms and conditions.

FURTHER DETAILS 

To assist us produce digital and paper listings of our features we request you supply;

Browse


Site Selection

Please select one site type below.


POWER

Power outlets are available in 10 Amp, 15 Amp and a limited amount of three phase (32 Amp). If power is required, it MUST be ordered NOW. It is the Features responsibility to supply a single 30m power lead perconnection to carry power from our distribution box to their site. The use of double adaptors or powerboards is NOT permitted at our distribution boxes. All leads and appliances must be tagged and tested tocomply with AS 3760.

Our power is connected to the public supply grid and or a private generator, therefore can be influenced byoutside influences. It is suggested all exhibitors supply surge protection and save computer documentsregularly in case power surge occurs.

Features who connect to our distribution boxes without prior purchase or permission will be invoiced thefull cost of the connection plus a $50 late connection fee.

Connections Required:

WATER REQUIREMENTS:

Drinking and agricultural water is readily available to selected areas around the site 

Features must supply appropriate fittings and a 20m hose.


SITE ACCESS

2 site access passes will be issued with every application which enables site access prior and during the event.

Additional access passes may be requested at this time